7/23/2008

And there was Floor...

I gave in to Trent's idea and we began installing the new flooring last night:
About 3 hours later, we were finished and I had reinstalled most of the quarter round molding around the toilet area. Tonight we're planning to finish installing the molding. Some of it snapped during demo so this will require another trip to the hardware store. And then I want to paint the recessed wall behind the toilet before we put it back - much easier than trying to work around it as I've done in our other two bathrooms.

9 comments:

  1. The floor looks great! You two do nice work! :-) You're right...much easier to paint before you put the toilet back in (speaking from experience)!

    ReplyDelete
  2. Looks great, Sarah! And I believe you that you did most of the work =)

    ReplyDelete
  3. wow, that's amazing. I love that youa re doing it yourself. Although i was hoping that yo'd win the paint first debate.

    ReplyDelete
  4. I think the floor looks great. I'm a fan of get the toilet back to working, and do it all at the same time. Just the way I am.

    ReplyDelete
  5. You guys have made serious progress on your bathroom. The floor looks great.

    ReplyDelete
  6. The floor looks great! Hope the painting turns out as well! At least youre getting all this DIY experience...

    ReplyDelete
  7. You are really getting there! I admire you for taking this on yourselves!

    ReplyDelete
  8. It's coming together! You'll be exhausted before the weekend!

    ReplyDelete
  9. Looks great Sarah!

    Why is it that when doing home projects there is always without fail the "need another trip to the hardware store." LOL

    BTW, I've been playing with your templates :)

    ReplyDelete

Thanks for leaving a comment! I enjoy reading them all. :)